IT. Expert System.

PHP

Add a high priority background task to be run in parallel


GearmanClient::addTaskHighBackground

(PECL gearman >= 0.5.0)

GearmanClient::addTaskHighBackgroundAdd a high priority background task to be run in parallel

Description

public GearmanTask GearmanClient::addTaskHighBackground ( string $function_name , string $workload [, mixed &$context [, string $unique ]] )

Adds a high priority background task to be run in parallel with other tasks. Call this method for all the tasks to be run in parallel, then call GearmanClient::runTasks() to perform the work. Tasks with a high priority will be selected from the queue before those of normal or low priority.

Parameters

function_name

A registered function the worker is to execute

workload

Serialized data to be processed

context

Application context to associate with a task

unique

A unique ID used to identify a particular task

Return Values

A GearmanTask object or FALSE if the task could not be added.

See Also



Content

Android Reference

Java basics

Java Enterprise Edition (EE)

Java Standard Edition (SE)

SQL

HTML

PHP

CSS

Java Script

MYSQL

JQUERY

VBS

REGEX

C

C++

C#

Design patterns

RFC (standard status)

RFC (proposed standard status)

RFC (draft standard status)

RFC (informational status)

RFC (experimental status)

RFC (best current practice status)

RFC (historic status)

RFC (unknown status)

IT dictionary

License.
All information of this service is derived from the free sources and is provided solely in the form of quotations. This service provides information and interfaces solely for the familiarization (not ownership) and under the "as is" condition.
Copyright 2016 © ELTASK.COM. All rights reserved.
Site is optimized for mobile devices.
Downloads: 47 / 158796285. Delta: 0.02651 с